Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13704422

- Product Categories
- Friendly Links
- home > Supply > Thin-walled hollow floor, should be days of building materials (online consultation), hollow floor
Information Name: | Thin-walled hollow floor, should be days of building materials (online consultation), hollow floor |
Published: | 2015-06-07 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Hollow floor, EPS filler rod, FAQs stuff installed 1, which is responsible for transport of materials have? A: According to the contract the two sides agreed. 2, Material Handling how to divide responsibilities? A: The supplier is responsible for loading eps hollow floor, the purchaser is responsible for unloading. 3, the product which party is responsible for installation? A: According to the contract the two sides agreed. 4, material storage space requirements? A: The site should be smooth and firm. 5, site material stacked requirements? A: The one-piece stacking hollow floor design can not be stacked. 6, material hoisting requirements? A: The one-piece lifting, you must double strand wire rope thin-walled hollow floor, non-single-strand lifting. 7, sponge paste requirements? A: The template must ensure smooth and clean and free of debris, the inside edges 10mm. 8, floor installation requirements? A: strict accordance with the construction icons Note Hollow Floor, distinguish Bodi box, heavy-bottomed tanks. 9. What are the requirements for concrete placement? A: vibrator diameter of not more than 25mm, pouring prohibited vibrators sidewalls. With the development of the construction industry in recent years, in-situ concrete hollow floor construction technique was widely promoted into practice, in the shopping malls, parking lots, office, teaching, housing and other public residential and industrial buildings and other large buildings in the design and construction , we have made considerable progress. Situ concrete hollow floor technique is to place embedded in the floor slab core die in accordance with specific rules, within the cavity at the site pouring concrete floor slab form. This technique has the floor can effectively reduce weight, improve seismic performance of buildings, reduce project costs, shorten the duration of the advantages, and help to improve clearance space utilization, and promote housing insulation, insulation, ventilation, lighting effects. Therefore, favored by the majority of the developers and owners. Thin-walled hollow floor, should be days of building materials (online consultation), hollow floor should be days by the Yancheng Building Materials Limited. Yancheng should be days of Building Materials Co. (ycytjc.com) (www.ycytjc.com) Jiangsu Yancheng, a leader in building materials processing, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs . In the days of building materials should be leading the staff warmly welcome all inquiries negotiations to create the building materials should be days of a better future. |
Admin>>>
You are the 18960 visitor
Copyright © GuangDong ICP No. 10089450, Yancheng Postsky Building Material Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 18960 visitor
Copyright © GuangDong ICP No. 10089450, Yancheng Postsky Building Material Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility