Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13704422

- Product Categories
- Friendly Links
- home > Supply > Total filling body should, Yancheng packing body, should be days of building materials
Information Name: | Total filling body should, Yancheng packing body, should be days of building materials |
Published: | 2015-05-08 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | New building materials - hollow floor slab is hollow mandrel should be days of new building materials Yancheng Building Materials Co. research production. Our main products - hollow floor, in-situ hollow floor, light filled body, thin-walled box, thin-walled square box, PMX lightweight composite housing, a hollow box cavity endometrium, endometrial combination, XY- 102 pearl type hydrophobic insulation panels. The economic advantages of in-situ concrete hollow floor situ concrete hollow floor has a light weight ,, steel-degree filling body, good seismic performance should be filled body altogether, good sound effects and increase headroom storey, reduce overall construction cost, etc., In the modern building social and economic benefits are obvious. In the provinces and cities have also been vigorously promoting and applications. Its advantages are as follows; 1 material savings (lower total cost) A. Fixed flat slab of reinforced concrete slab at a cost of 60%, reducing the cost of reinforced concrete. B. Reducing the total amount of reinforced concrete slabs. C. Due to the weight of the lower support price floor column packing body, wall and base load is correspondingly reduced, so that they can be reduced member section, reduce reinforcement, saving the cost of the vertical member; D. Reduced-storey improved headroom filling body engineering, reducing the vertical water, electricity, wind, elevators, interior and exterior renovation and other expenses; E. Omit the ceiling, reducing the ceiling decoration and ceiling updated fee: F. Construction units to reduce the template loss, reducing the branch, Chaimo labor costs. Compared with ordinary slab structural system, increased costs of production and installation costs have filled cement thin-walled tube. Situ hollow concrete structure system, changes in the cost of offset, depending on the span and the load can be reduced by 5% -20% of the total construction cost. Compared with the general floor structure, reinforced concrete costs reduced by 5%, templates loss reduced by 50%, saving vertical water, electricity, elevators, air conditioning, interior wall decoration costs by 10% -15%. Total filling body should, Yancheng packing body, should be days should be days of building materials by the Yancheng Building Materials Limited. Yancheng should be days of Building Materials Co. (ycytjc.com) (www.ycytjc.com) strong, credible, Yancheng in Jiangsu Province building materials processing industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas should be days of building materials will lead into the brilliant and you work for a better future! |
Admin>>>
You are the 18960 visitor
Copyright © GuangDong ICP No. 10089450, Yancheng Postsky Building Material Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 18960 visitor
Copyright © GuangDong ICP No. 10089450, Yancheng Postsky Building Material Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility